Tanzanian Client Ordered 4-Axle 80Ton Rear Dump Semi Trailers
Sep. 21, 2026
Project Overview
A Tanzania-based mining and infrastructure logistics provider ordered six ROADKING 4 axle 80 ton rear dump semi trailers. The company serves mining and construction projects across East Africa, transporting materials from mines and quarries to Dar es Salaam Port and construction sites.
The six trailers have completed production and have been shipped from Tianjin Port to Dar es Salaam Port. The order is under FOB Tianjin terms.
Customer Background and Transport Requirements
The customer supports material transport for gold and coal mining around Lake Victoria, as well as road, railway and other infrastructure projects in Tanzania. Typical cargo includes mined materials, earthworks and aggregates.
The customer’s routes include gravel and dirt roads, uneven surfaces and muddy conditions during the rainy season. The fleet therefore needs high-capacity trailers suited to demanding operating conditions, with axle loads and route requirements also taken into account.
Challenges
The customer’s previous fleet relied mainly on used three axle dump semi trailers. During heavy-duty operations, the trailers experienced chassis deformation, suspension damage, rapid tire wear and recurring hydraulic lifting-system faults. Repairs and downtime affected transport schedules and increased operating costs.
When evaluating new trailers, the customer focused on load capacity, structural strength, unloading efficiency and suitability for local road conditions.
ROADKING Recommended Solution
After visiting the factory and discussing materials, welding, hydraulic equipment and application requirements with the ROADKING team, the customer selected six four axle rear dump semi trailers.
The trailers feature a T700 high-strength steel main beam, heavy-duty mechanical suspension and a HYVA front lifting cylinder. Each rectangular dump body has a confirmed effective volume of 38.6 m³.

Confirmed Trailer Configuration
| Specification | Details |
|---|---|
| Product | 4 Axle Heavy Duty Rear Dump Semi Trailer |
| Order quantity | 6 units |
| Rated payload | 80 tons |
| Axles | 4 × FUWA, rated at 20 tons per axle |
| Overall dimensions | 11,000 × 2,500 × 2,800 mm |
| Dumping method | Rear dump |
| Body type | Rectangular |
| Body internal dimensions | 10,500 × 2,300 × 1,600 mm |
| Effective body volume | 38.6 m³ |
| Hydraulic cylinder | HYVA FC137-5-5320 front lifting cylinder |
| Main beam material | T700 high-strength steel |
| Main beam dimensions | 500 mm height; 14 mm upper flange, 8 mm web, 16 mm lower flange |
| Body material | Q345B steel |
| Body plate thickness | 5 mm floor; 4 mm sides |
| Suspension | Heavy-duty mechanical suspension |
| Tires | 16 × 12R22.5 |
| Wheels | 16 steel rims |
| Leaf springs | Reinforced, 90 × 16 mm × 10 leaves |
| Braking and ABS | WABCO braking system with ABS |
| Landing gear | JOST 28-ton, dual-speed |
| Kingpin | JOST #50 or #90, according to tractor-head compatibility |
| Color | Customer-specified engineering yellow |
| Destination port | Dar es Salaam Port, Tanzania |
| Trade term | FOB Tianjin |
Production and Shipment
The customer’s team visited the factory to review production and discuss the trailer configuration with ROADKING. All six units have completed production and have been shipped from Tianjin Port to Dar es Salaam Port under FOB Tianjin terms.
Expected Performance and Operating Benefits
The trailers are configured for transporting ore, earthworks and aggregates. Four FUWA axles, each rated at 20 tons, work with the T700 high-strength steel main beam to support heavy loads and provide structural support on challenging routes. The heavy-duty mechanical suspension and reinforced leaf springs are designed for demanding conditions, including gravel and dirt roads.
Each trailer has a 38.6 m³ body and a HYVA front lifting cylinder for rear unloading at mines and construction sites. The WABCO braking system with ABS is designed to support controlled braking. Actual braking performance depends on factors such as load, speed, road conditions and maintenance.
Based on the confirmed configuration and intended applications, the trailers are expected to help increase the amount of material transported per trip, support efficient unloading and reduce downtime associated with chassis, suspension and hydraulic-system faults. Actual fuel consumption, maintenance frequency, transport efficiency and service life will depend on operating conditions and maintenance.
Compliance Note
The trailers have a design rated payload of 80 tons. Actual loading and road operation must comply with Tanzania’s applicable axle-load limits, route restrictions and heavy-transport permit requirements.
Contact ROADKING
For a rear dump semi trailer configured for mining or construction transport, contact SHANDONG ROADKING VEHICLE CO., LTD. to discuss your cargo, route conditions and tractor-head specifications.